Littleport primary school

 

  littleport-main-352.jpg

Commission facts and figures    

ClientCambridgeshire County Council   
 
Contract typeJCT Local authority with quantities 
Contract value£4.6 million 
Contract date:January 2006 
Contractor:Wates Construction Ltd 
Completion:June 2007 
Download the PDF 
case study
 

Additional views of the commission (click to enlarge)

 littleport-1-thumbnail.jpg  littleport-2-thumbnail.jpg littleport-3-thumbnail.jpg   littleport-floorplan-thumbnail.jpg 

Overview

Littleport Community Primary School, a 420 place primary school, has benefited from the professionalism of the Mouchel Parkman design team.

The project’s first phase, a new build to replace the run down older facilities, was completed two weeks ahead of schedule. The design itself, carried out within the Cambridge Property Office’s Design Centre of Excellence, uses a primary steel frame and proprietary metal roof and wall cladding system.  

These materials and design were specifically selected to speed along the construction. The open and spacious teaching areas make the best possible use of the lofty space by having generous sloping soffits including high level opening rooflights, improving ventilation in the school.